Per the schedule received:
Demo 1 (Phase 1) + Log Book:
Week 7 (23/08/2010 – 27/08/2010):15 marks or 5%
Demo 2 (Phase 2) + Log Book:
Week 11 (04/10/2010 – 09/10/2010): 15 marks or 5%
PSM 2 Supervisor Draft Report Correction:
Week 13 (18/10/2010 – 22/10/2010)
Tuesday, July 27, 2010
Friday, July 23, 2010
PSM2 progress so far
Acquired the necessary RFID equipments (Tags and readers), except there's a problem - they don't seem to be detected by the O/S.
It won't work on Win 7 64 bit, so I have to use virtual PC to set it up. That being said, I still have not a bit of idea to make them work. I could use some guidance...
It won't work on Win 7 64 bit, so I have to use virtual PC to set it up. That being said, I still have not a bit of idea to make them work. I could use some guidance...
Monday, July 12, 2010
PSM2 progress
So far the system's database is already in progress, but the database is only good for data access only; the RFID tracking system is the most critical part. So far there is one at here that gives me a good insight on how it should be: http://www.ns-tech.co.uk/blog/2010/02/active-rfid-tracking-system/
The problem with the sample is the back side is written with Python, unless I can take a crash course to learn Python in the short timeframe then I may need to think of translating the Python to Java somehow. Front side is written with PHP so it should be good.
More updates to come in later time.
The problem with the sample is the back side is written with Python, unless I can take a crash course to learn Python in the short timeframe then I may need to think of translating the Python to Java somehow. Front side is written with PHP so it should be good.
More updates to come in later time.
Subscribe to:
Posts (Atom)